Project Examples Energy

Statkraft Energi AS

Rehabilitation Nedre Røssåga power-plant

PROJECT
REHABILITATION OF NEDRE-RØSSÅGA POWER STATION

COMPLETE EPCI DELIVERY

  • Removal of the existing gate leaf
  • Removal of the existing slide strips
    in the side guides and top beam
  • Installation of stainless steel
    cladding in the side guides,
    bottom sill, and top beam
  • EPCI delivery of 6 new draft
    tube gates (W×H = 3.2 × 3.3 m)
    in stainless steel
  • Pressure: 8.2 mWC
    (meters of water column)
  • Supply of new hoist rods
    with interlocks and a new
    limit switch system

DURATION
2016 – 2018