Mining | Mining
Boliden Aitik
INSTALLATION CONSTRUCTION & STEEL
New total contract, of 2 units. large-scale pumping stations, 1 valve chamber.SERVICES
INCLUDED
- Excavation work and blasting
- Work concrete
- Turnkey installation on sluice gate
- Steel construction with sandwich installation
- Pipe in duplex
- Equipment installation
- Steel structures and welding
- Electro
- Automation
- Engeneering
DURATION
2022 – 2025
WORKERS
Up to 110 people (in shifts)