Boliden Aitik

INSTALLATION CONSTRUCTION & STEEL

New total contract, of 2 units. large-scale pumping stations, 1 valve chamber.SERVICES

INCLUDED

  • Excavation work and blasting
  • Work concrete
  • Turnkey installation on sluice gate
  • Steel construction with sandwich installation
  • Pipe in duplex
  • Equipment installation
  • Steel structures and welding
  • Electro
  • Automation
  • Engeneering

DURATION
2022 – 2025

WORKERS
Up to 110 people (in shifts)